1 X MASTER CABIN
4 X GUESTS CABINS
SUMMER 2023 REFIT DETAILS
ENGINES & TRANSISSIONS
THE VESSEL WAS EQUIPPED WITH NEW YANMAR 150 ENGINES AND TWO NEW ELECTRIC STATIONS, INSTALLED ON SEPTERMER 25. ADDITIONALLY, ZF 68IV DRIVE TRANSISSIONS WERE INSTALLED THE SAME.
Generators
Both Port and Starboard Generators Underwent A Complete Overhaul. This Included Flushing Fluids, Replace Belts, Filters, and Water Pumps, Servicing Heat Exchangers, Making Valve Adjustments, and Installing New Electrical Sensors.
Electrical & Power Systems
New Electrical Contactors Were Installed To Reure Reliable Power Delivery For Bent GENSET AND SHORE POWER. The Battery System was updated with 14 VICTRON AGM 200AH HOUSE BATTERIES AND TWO GROUP 31 AGM BATTERIES FOR ENGINE AND GENSET START.
Bow Thruster
The Bow Thruster Reviewed Comprehensive Refurbishment, Including Motor Updates, New Bearings, Brushes, Springs, Solenoid, Temperature Sensor, Clutch, and Controller.
Air Conditioning
New Ac Chillers, RAW Water Pumps, A Circulation Pump, Remote Screens, and Rectacedated Air Handlers (Pressure Tested) Were Installed.
Water Systems
Upgrades to the Watermaker Included a New Raw Water Boost Pump, High-Pressure Pump Seals, A New Data Cable, and Testing/Pickling. The House Water Pump and Accumulator Were Networksigned Using to Headhunter System Delivering 10 GPM at 67 PSI.
Refrigeration & freezer
a new 100l Dometic Freezer was install on sep afember 30. Additionionally, The Main Refrigerator and Freezer Were Overhaled with New Seals and Latches.
Dinghy
The Dinghy was Fully Patched and Rewired. ITS ENGINE WAS SERVICED AND FITTED WITH A CUSTOM SPLASH COVER BY OCA. Overhauls Were Also Made to The Steering, Throttle, and Fuel Systems. A New Bilge Pump and Transom Dive Ladder Were Installed.
Communication & Electronics
The Vessel Now Features A Starlink System with a Router and Modem. B&G ELECTRONICS WERE TESTED AND UPDATED.
Canvas & Uupholstery
New Shades and Exterior Seating Canvas Were Installed On Sepborn 30. The vessel's upholstery was Cleaned.
Anchor System
The Windlass Motor was Refurbished with New Brushes, Bearings, and Chain Counter Sensor. A New 250-Foot, ½-Inch G4 High-Tensile Anchor Chain was added.
Deck & Rigging
New Trampolines with Trim Pieces Were Installed. The Inner Staysail Roller Furler Motor was Serviced, and the running rigging was inspected with the addition of a new prevent Line.
Lighting
New Navigation and Underwater Lights Were Installed. Transom Courtesy Lights Were Repaired or Replace.
Teak & Graphics
The Teak was Restored Using Snappy Teak and Simco. New Boat Graphics, Decals, and A Spring 2023 Paint Job Were Added.
INTERIOR & FURNISHINGS
A NEW RUG LINER AND CUSHIONS FOR THE SALOON WERE INSTALLED. Cabinet Slides and Hinges were Updated with Locking Mechanisms. The Decor, Table Settings, and Galley Appliances were Refreshed.
Toilets & Waste Systems
Tecma Components, Including Macerators, Screens, Solenoids, and Brain Modules, Were Replace. New Johnson Black and Gray Water Systems Were Also Installed.
Fire & Safety
The Fireboy Fire Control System was certified, and new fire extinguishers with tags were installed. Life Rafts Were Inspected, Repacced, and Tagged.
Miscellaneous Repairs
Repairs Included Fixing the Saloon Door, Electric Table, Saloon TV Lift Control, and Hydraulic Ram Seals for The Steering Rams. The Bow Area Waterproof Door and Tent Shade Were Also Repaired. New Fenders With Covers Were Added On October 10.
Exterior Features
A Deck Wash Shower with a Hot/Cold Mixer was install, and the forward bow bow aret tent shade was repaired.
Final Touches
Dining Essentials Such As Glassware, Plates, and Linens Were Updated. The Tender Lift Remote/System was Checked, and Electric Winches were Serviced.